Class A Demising Walls, Field-Verified Before Turnover

Year
2026
Specified Rating
STC 50 to 55
Scope
Demising wall verification
When Tested
Before turnover
A construction manager finishing a Class A commercial office fit-out needed the newly built demising walls verified to their specified rating, STC 50 to 55, before turning the space over to the owner. The timeline was urgent.
Memtech Acoustics field-tested the completed walls against the specification using calibrated, NIST-traceable Class 1 instrumentation, following the recognized field standard for airborne sound isolation. Memtech measured each wall as built and reported the achieved rating against the contract requirement.
Testing before turnover meant any shortfall could be corrected while the trades were still mobilized, rather than surfacing as a callback against retainage after occupancy. The construction manager received documented results to provide directly to the owner, closing the acoustic item in the project closeout with measured data.
Highlights
- Class A demising walls tested against the specified STC 50 to 55 requirement
- Calibrated, NIST-traceable Class 1 instrumentation, following the recognized field test standard
- Documented results delivered on an urgent pre-turnover timeline
- Closeout documentation the construction manager could provide directly to the owner
Facing a similar challenge?
Every project starts with a conversation. Tell us about your space and we will outline your options.
Start the ConversationDid you know? A 10 dB reduction cuts perceived noise in half. Hear the difference for yourself.
Listen to Sound Demos →Related Projects


Sylvan Lake Community Center

Apostolic Christian Church of Livonia