A construction company's event center in Livonia works as one large hall or two smaller rooms, and both configurations echoed badly. With the dividing wall open, reverberation reached 4.17 seconds. Memtech Acoustics measured the hall in three configurations, modeled treatment to a 1.5 second target, and supplied 3,120 square feet of ceiling panels, with installation coordinated in June 2024.
Livonia, MI
Floor plan of the divisible event hall showing the dividing wall line, pillars, doors, and ceiling heights of 26 feet 4 inches and 16 feet 9 inches

Year

2024

Reverberation measured

4.17 s

Design target

1.5 s

Ceiling treatment supplied

3,120 SF

Services Provided

Acoustic Baseline Study, RT60 Testing, Treatment Design, Material Supply, Installation Coordination

A construction company in Livonia, Michigan has a large event center. A movable dividing wall lets the room work as one open hall of roughly sixty-eight by eighty feet or as two separate rooms. In every configuration, the space echoed badly enough to make speech hard to follow.

Challenge

Memtech Acoustics measured reverberation time (RT60) in three configurations: the hall fully open, and each side with the dividing wall in place. Fully open, reverberation reached 4.17 seconds, far beyond the 1.5 seconds a room used for speech should hold. With the wall in place, the two sides measured about 2.1 and 3.2 seconds. Tests were repeated at each position to confirm the results. The problem sound sat in the 1.5 to 4.5 kHz range, the band that carries the consonants of speech, which is why listeners heard a hard slap-back on every word. The room's smooth, symmetric surfaces and open ceiling drove the effect.

Solution

Memtech set a 1.5 second target for the open hall and used a parametric model to size the treatment. The first plan called for high-absorption panels across the open ceiling deck and fabric-wrapped panels on the walls, with a reduced-coverage option modeled to hold the room under 2.5 seconds for a lower budget.

The final design was revised to focus on the ceilings. Memtech supplied 3,120 square feet of 2-inch open-cell foam panels for the north and south event space ceilings and the north high-bay soffit, in a custom color the client approved, and coordinated the installation in June 2024.

Results

The ceiling treatment was installed in June 2024. No reverberation measurement was taken after installation, so the improvement has not been confirmed by measurement.

Facing a similar challenge?

Every project starts with a conversation. Tell us about your space and we will outline your options.

Start the Conversation

Did you know? A 10 dB reduction cuts perceived noise in half. Hear the difference for yourself.

Listen to Sound Demos →

Related Projects

Michigan Association of Conservation Districts

The Michigan Association of Conservation Districts measured reverberation as high as 4.0 seconds in the open meeting room at its Allegan office, a room used for board meetings and workshops. Memtech Acoustics measured the space and engineered a wall and ceiling panel layout modeled to bring reverberation under 1.0 second so staff can hear one another clearly.
Read Case Study

Sylvan Lake Community Center

The Sylvan Lake Community Center's multipurpose room seats up to 150 for events, ceremonies, and film showings, but its vaulted ceiling and hard surfaces pushed reverberation to 1.9 seconds, well past the point where speech stays clear. Memtech Acoustics measured the room and engineered a ceiling and wall panel layout modeled to bring it to a 1.0 second target.
Read Case Study

Apostolic Christian Church of Livonia

The dining hall at Apostolic Christian Church of Livonia grew hard to talk in when the room filled for gatherings of up to eighty people. Memtech Acoustics measured reverberation at 0.8 seconds, above the range a shared meal and conversation call for. Memtech engineered a wall panel and ceiling tile layout and confirmed by measurement that reverberation dropped to between 0.5 and 0.6 seconds.
Read Case Study
Modern open office with blue acoustic ceiling baffles designed to absorb sound and reduce workplace noise.

Let's Get Started. Contact Us.

Talk to our experts. We’ll assess your needs and recommend a solution that works for your project.