Close-up of dark gray acoustic foam panels with pyramid-shaped protrusions arranged in a grid pattern.

QuietSwing Doors: Telemundo Center

Industry:
Commercial
,
Application:
Commercial Noise Control
,
NBC Universal Telemundo Enterprises' 460,000 sq ft global headquarters in Miami required heavy-duty and architectural sound control doors, including STC 59 soundstage doors and 56 studio-grade QuietSwing doors and QuietLite windows across 13 production studios.
Miami, Florida

Year

2019

Facility Size

460,000 SF

Soundstage Doors

13 Units

Max STC Rating

STC 59

Products Featured:

Products Featured: QuietSwing Doors, QuietLite Windows

Challenge

Telemundo Center in Miami, Florida is the state-of-the-art global headquarters for NBC Universal Telemundo Enterprises. This 460,000 square foot multimedia production facility consolidates all Telemundo operations that were previously scattered across Miami. The facility houses 13 production studios and 2 digital studios responsible for creating approximately 3,000 hours of entertainment programming each year. The scale and diversity of production activity created an absolute requirement for high-performance acoustically rated doors and windows throughout the facility.

Solution

A comprehensive door and window package spanning three performance tiers addressed the varying acoustic isolation requirements across the facility.

The most demanding application required 12 double leaf and 1 single leaf STC 59 soundstage doors, known as Elephant doors, measuring up to 16 ft wide by 16 ft high and 7 inches thick. These massive doors provide the acoustic isolation required between production soundstages where simultaneous live broadcasts and recordings occur.

For control rooms, voice-over rooms, studios, and edit suites, the package included 27 QuietSwing STC 51 doors (2.5 inch thick) and 29 STC 54 doors (3.5 inch thick), along with QuietLite sound control windows. This tiered approach matched the acoustic performance to the specific isolation requirements of each space type.

At the time of award, independent test data for the STC 59 Elephant doors did not yet exist. The contract was awarded on a conditional basis requiring fabrication of a prototype for laboratory testing. After the prototype was built and tested, the contractor and acoustical consultant traveled to the testing facility to witness a repeat test, confirming the performance met specification.

Results

The project succeeded through a deep team approach with members from multiple areas of expertise working together toward the shared goal. The combination of heavy-duty soundstage doors for large-format production spaces and architectural-grade doors for studios and control rooms provided Telemundo Center with the acoustic isolation required for a world-class multimedia production facility.

Facing a similar challenge?

Every project starts with a conversation. Tell us about your space and we will outline your options.

Start the Conversation

Did you know? A 10 dB reduction cuts perceived noise in half. Hear the difference for yourself.

Listen to Sound Demos →

Related Projects

Michigan Association of Conservation Districts

The Michigan Association of Conservation Districts measured reverberation as high as 4.0 seconds in the open meeting room at its Allegan office, a room used for board meetings and workshops. Memtech Acoustics measured the space and engineered a wall and ceiling panel layout modeled to bring reverberation under 1.0 second so staff can hear one another clearly.
Read Case Study

Sylvan Lake Community Center

The Sylvan Lake Community Center's multipurpose room seats up to 150 for events, ceremonies, and film showings, but its vaulted ceiling and hard surfaces pushed reverberation to 1.9 seconds, well past the point where speech stays clear. Memtech Acoustics measured the room and engineered a ceiling and wall panel layout modeled to bring it to a 1.0 second target.
Read Case Study

Apostolic Christian Church of Livonia

The dining hall at Apostolic Christian Church of Livonia grew hard to talk in when the room filled for gatherings of up to eighty people. Memtech Acoustics measured reverberation at 0.8 seconds, above the range a shared meal and conversation call for. Memtech engineered a wall panel and ceiling tile layout and confirmed by measurement that reverberation dropped to between 0.5 and 0.6 seconds.
Read Case Study
Modern open office with blue acoustic ceiling baffles designed to absorb sound and reduce workplace noise.

Let's Get Started. Contact Us.

Talk to our experts. We’ll assess your needs and recommend a solution that works for your project.