Challenge
The Oakland County Sheriff's Office substation in Lyon Township (New Hudson, Michigan) reported echo in its interrogation and interview rooms, which have hard, painted walls. Memtech Acoustics met the substation commander on site in June 2021 to review the rooms.
Solution
Memtech specified 2-inch fabric-wrapped absorptive wall panels, 24 by 48 inches, with chemically hardened square edges, clip-mounted on the upper walls in a gray fabric. The scope also included two door seal kits, each with a heavy-duty automatic door bottom and neoprene perimeter gaskets. The order was approved in May 2023 on an expedited production schedule, and Memtech coordinated the installation in June 2023.

Results
Twenty-two panels and two door seal kits were supplied and installed. No acoustic measurements were taken before or after installation, so this case study reports the scope delivered, not a measured change.
Facing a similar challenge?
Every project starts with a conversation. Tell us about your space and we will outline your options.
Start the ConversationDid you know? A 10 dB reduction cuts perceived noise in half. Hear the difference for yourself.
Listen to Sound Demos →Related Projects


Sylvan Lake Community Center

Apostolic Christian Church of Livonia